Project:
Reebok Warehouse
We collaborate in:
BIM modelling. Point cloud modelling from pre-existing, coordination of interferences, quantification of structural materials, executive documentation.

location
Lancaster – UK
area
250.000 m²
year
2019
DESCRIPTION:
From the survey of the pre-existence with a point cloud, the challenge of BIM modelling was set for the detection of interferences with the newly designed project.
It was then possible to design the new project in the best way, taking into account the quantification of materials, and the project was completed without any inconsistencies.